Live Oxon Primary School This JCT design and build contract at Oxon Primary School involves expanding the existing school hall. Existing storage sheds will be moved and repositioned as part of the project.
Packwood Haugh School We successfully completed a comprehensive project to revolutionize the science facilities at Packwood Haugh School in Ruyton-XI-Towns. The project began with the meticulous demolition of the existing single-story science labs,
Riggs Hall, Shrewsbury School The final outcome of this project resulted in a sympathetically restored boarding house with much-needed additional accommodation that transported the building to the modern era, ensuring its purpose for years to come.
Haughmond Federation, Shrewsbury The latest in a new generation of Shropshire schools has been unveiled following our completion of this project to provide more sustainable education facilities in the county.
Shifnal Primary School This Project was to construct a KS2 Block which contained two classrooms, a General Purpose room, and two toilets. We also refurbished a toilet block and two further classrooms within
Long Mountain C of E Primary School The project was to build two extensions to the existing school, form two new play areas and enlarge the parking area to the front of school. The rear extension was
Concord College Science Block We were involved at an early stage of design process, enabling us to ensure that the design was correct and the vision of the College could be realised. Following the
Millbrook Primary School The works were comprised of the design and construction of a new Nursery Extension, internal alterations to the existing class bases and associated landscaping and canopy. The design intention was
New DT Classroom, Meole Brace School & Science college This project to form new DT classroom was originally to be built using traditional trench foundation footings to a sloping site with a beam and block floor to the height