Live Oakengates Leisure Centre Gym Refrubishment Phase One of the refurbishment at Oakengates Leisure Centre includes bringing new life to the gym by replacing old windows with sleek curtain walling sections and removing the asbestos
Live Oxon Primary School This JCT design and build contract at Oxon Primary School involves expanding the existing school hall. Existing storage sheds will be moved and repositioned as part of the project.
Live Ercall Wood Academy This project will see a new three-storey science block building, a single-storey dining hall extension and internal refurbishments to ground floor classrooms and staircase areas. Start date – 24th March
Helsby High School Existing portacabins have been demolished and we have built a new four-classroom block in their place at Helsby High School. The School’s new single-storey extension was handed over in time
Live Lawley Village Academy Primary School This project involves the expansion of the existing Lawley Village Primary School Academy to increase capacity from 210 to 420 children to become a ‘two form-entry school’. It will provide
Cats Protection Exeter Axhayes Adoption Centre We are thrilled to have completed our second state-of-the-art build for Cats Protection. The Axhayes Centre is a brand new flagship adoption facility boasting 66 pens, including 12 maternity and
Packwood Haugh School We successfully completed a comprehensive project to revolutionize the science facilities at Packwood Haugh School in Ruyton-XI-Towns. The project began with the meticulous demolition of the existing single-story science labs,
Laboratory Refurbishment, Glyndŵr University We completed alterations and a fit-out to the existing facilities at the Plas Coch site in Mold Road to deliver a new wet chemical laboratory, a forensic science laboratory and a laboratory preparation area.