1 Walker Street Pave Aways is pleased to be at the forefront of restoring Wellington’s former YMCA building at 1 Walker Street, a key part of Telford & Wrekin Council’s vision to regenerate
Oakengates Leisure Centre Gym Refrubishment Phase One of the refurbishment at Oakengates Leisure Centre includes bringing new life to the gym by replacing old windows with sleek curtain walling sections and removing the asbestos
Live Ercall Wood Academy A new three-storey science block building, a single-storey dining hall extension and internal refurbishments to ground floor classrooms and staircase areas, completed in September 2025. Take a look at the
Lawley Village Academy Primary School The design and build, single-storey expansion of Lawley Village Primary Academy has provided six new classrooms and a purpose-built nursery, alongside associated mechanical and electrical installations, groundworks, drainage and car
13 properties at Pool Meadow, Hadley The project comprised the construction of 13 residential properties on a brownfield site following the demolition of a 3 story block of flats along with associated garages and storage buildings.
Polytec Industrial Facility The Works comprised of the Design and Construction of a new build steel frame Industrial Facility for Manufacture and Painting of Vehicle Components. The Facility includes Offices, Staff Welfare, Specialised
Teagues Bridge Primary School Multi-phase project to refurbish and extend the current school to include an additional three classrooms and hall extension. The phases were: Phase 1 – Three Class base Extension – traditional