Live 1 Walker Street Pave Aways is pleased to be at the forefront of restoring Wellington’s former YMCA building at 1 Walker Street, a key part of Telford & Wrekin Council’s vision to regenerate
Wrexham University Science Engineering Refurbishment The project involved the relocation of the engineering faculty into the existing building, optimising the use of underutilised rooms and enhancing their integration with the rest of the building and
Huxley Laboratory Refurbishment, Keele University Pave Aways delivered a comprehensive refurbishment of the Huxley Laboratory, a project that has enhanced the facility’s capabilities. This project involved a two-phase approach. Phase one consisted of selective demolition
Live Oakengates Leisure Centre Gym Refrubishment Phase One of the refurbishment at Oakengates Leisure Centre includes bringing new life to the gym by replacing old windows with sleek curtain walling sections and removing the asbestos
Oxon Primary School This project involved the extension of the existing school hall under a JCT Design and Build Contract, completed over a 30-week period. Key works included expanding the hall space, mechanical
Live Ercall Wood Academy A new three-storey science block building, a single-storey dining hall extension and internal refurbishments to ground floor classrooms and staircase areas, completed in September 2025. Take a look at the
Staffordshire History Centre & William Salt Library This project delivered key improvements to enhance capacity, functionality, and aesthetics. We constructed a new concrete frame extension, overhauled mechanical and electrical systems for efficiency and sustainability, transformed the courtyard with a glazed canopy and landscaping, and sensitively refurbished the Grade II* Listed William Salt Library. The refurbishment preserved the library’s historical character while integrating modern facilities, ensuring its continued use for future generations.
Helsby High School Existing portacabins have been demolished and we have built a new four-classroom block in their place at Helsby High School. The School’s new single-storey extension was handed over in time
Lawley Village Academy Primary School The design and build, single-storey expansion of Lawley Village Primary Academy has provided six new classrooms and a purpose-built nursery, alongside associated mechanical and electrical installations, groundworks, drainage and car