Helsby High School Existing portacabins have been demolished and we have built a new four-classroom block in their place at Helsby High School. The School’s new single-storey extension was handed over in time
Packwood Haugh School We successfully completed a comprehensive project to revolutionize the science facilities at Packwood Haugh School in Ruyton-XI-Towns. The project began with the meticulous demolition of the existing single-story science labs,
Laboratory Refurbishment, Glyndŵr University We completed alterations and a fit-out to the existing facilities at the Plas Coch site in Mold Road to deliver a new wet chemical laboratory, a forensic science laboratory and a laboratory preparation area.
Riggs Hall, Shrewsbury School The final outcome of this project resulted in a sympathetically restored boarding house with much-needed additional accommodation that transported the building to the modern era, ensuring its purpose for years to come.
Centre of Excellence, Staffordshire University Featuring the most advanced health simulation technology, the Centre offers a series of flexible and immersive simulation spaces designed to enhance clinical competency and the learning experience for students.
Haughmond Federation, Shrewsbury The latest in a new generation of Shropshire schools has been unveiled following our completion of this project to provide more sustainable education facilities in the county.
Welshpool High School Changing Room and W.C Refurbishment The project was the refurbishment of the existing boys and girls shower rooms, WC facilities, changing rooms and cloak rooms. The works included: • demolition of walls • formation of
Welshpool Primary School Work on the new Welshpool school started in July 2018 but came to a halt in March 2019 (week 27 of a 52 week build) when the main contractor, Dawnus
Shifnal Primary School This Project was to construct a KS2 Block which contained two classrooms, a General Purpose room, and two toilets. We also refurbished a toilet block and two further classrooms within